Service Type: China-Europe Railway Express
Departure: Shenzhen (Factory / Warehouse)
Destination: Germany (Hamburg / Duisburg rail terminal)
Cargo: Steel Wire Brushes, Nylon Brushes (English name & HS code required)
Container: 1×40HQ High Cube
Special Requirements: Direct loading at factory, including trucking, customs clearance & full rail service
1. Client signs Railway Transport Authorization, confirming terms (FCA/DAP) and responsibilities.
2. We apply for railway space and obtain transport plan (train No., departure time, cargo cutoff).
3. Issue Booking Confirmation with train date, railway waybill No., document & cargo cutoff times.
Document List
• Basic docs: Packing list, sales contract, commercial invoice, customs power of attorney (stamped).
• Declaration Elements:
• Description:
- Steel Wire Brush (HS: 9603.40.90)
- Nylon Brush (HS: 9603.50.90)
• Material: Steel/nylon bristles, plastic or wooden handle
• Use: Industrial / household cleaning
• Brand: Neutral / client brand (authorization required if branded)
• Model: Brush size, handle type, etc.
Shenzhen Customs Clearance
1. Pre-declaration via Single Window system to obtain pre-entry number.
2. Formal declaration with physical documents to Shenzhen Customs for release notice.
3. Special Notes:
• Wooden handles require phytosanitary certificate if applicable.
• Brushes exported to EU must comply with REACH, CE or relevant standards.
Pickup Arrangement
1. Dispatch truck to factory, verify description, quantity and packaging.
2. Supervise loading to ensure secure, moisture-proof packaging.
Warehouse Handling
1. After arrival at Shenzhen warehouse:
• System entry: weight, volume, destination, customs mode.
• Labeling: company label with marks, destination, waybill No.
2. Discrepancies: immediately inform client for solution.
Terminal Preparation
1. Deliver container to rail terminal per cutoff time.
2. Submit Equipment Interchange Receipt (EIR) for container & seal No.
Departure Follow-up
1. Confirm customs release before loading onto train.
2. Track train status and ETA, update client.
3. Provide copy of Railway Waybill (RWB).
Special Requirements for Brushes
1. Steel brushes must comply with EU heavy metal limits (REACH).
2. Nylon plastic brushes must meet EU plastic safety standards.
3. Branded goods require brand authorization.
Factory Loading Risks
1. Factory must have proper loading conditions; on-site supervision recommended.
2. Cargo insurance recommended for full rail journey.
Rail Transport Risks
1. Delays possible due to weather, border congestion, customs.
2. EU import docs (EORI, import declaration) must be prepared in advance.
1. Progress updates: booking confirmation, customs release, departure, arrival.
2. Exception handling: solution provided within 24 hours for inspection or delay.
3. Arrival alert: notify client 3–5 days before ETA for pickup.
We can also prepare:
• Transit time schedule (Shenzhen – Germany)
• Cost breakdown (trucking, customs, rail freight, insurance)
• EU import customs document checklist
Zhongning can bring you many advantages, and you will definitely benefit from them.